Proper operation ensures safety and extends service life of your Huaquan generator set. Follow these essential guidelines:
1. Pre-Operation Checks for Huaquan Generator Set
Verify oil and coolant levels before each use
Inspect fuel lines for leaks or damage
Ensure proper ventilation around the Huaquan generator set
Check battery connections (for electric start models)
2. Safe Startup Procedures for Huaquan Generator Set
Always start the Huaquan generator set in a no-load condition
Allow 2-3 minutes warm-up time before applying load
Gradually add electrical loads within rated capacity
Never exceed maximum load specifications
3. Operational Best Practices
Monitor operating temperature during use
Listen for abnormal engine noises
Watch for warning lights or alarms
Keep flammable materials away from exhaust system
4. Proper Shutdown Process for Huaquan Generator Set
Gradually reduce electrical loads before shutdown
Allow 3-5 minutes cool-down period
Turn fuel valve to "OFF" position (for extended storage)
Disconnect battery if storing for prolonged periods
5. Routine Maintenance
Follow manufacturer's maintenance schedule
Keep detailed service records
Use only recommended fluids and parts
Store fuel properly with stabilizers when needed
By following these precautions, your Huaquan generator set will deliver reliable performance while maintaining operational safety.
More information about Huaquan Power:http://www.hqstr.com/