Proper maintenance after shutdown is crucial for preserving the performance and extending the service life of Huaquan generator sets. This document outlines systematic procedures to follow when the equipment is not in operation.
1. Cooling System Maintenance for Huaquan Generator Set
Inspect coolant levels and top up if necessary
Check for leaks in hoses and connections
Drain and replace coolant according to manufacturer's schedule
2. Engine Preservation
Run Huaquan generator set periodically during extended storage
Apply rust prevention oil to exposed metal surfaces
Turn engine crankshaft manually every 30 days
3. Fuel System Care for Huaquan Generator Set
Stabilize fuel with appropriate additives
Drain fuel system completely for long-term storage
Inspect fuel filters and replace if needed
4. Battery Maintenance for Huaquan Generator Set
Disconnect and clean battery terminals
Store batteries in cool, dry location
Maintain proper charge level during storage
5. Electrical System Protection
Cover control panel to prevent dust accumulation
Inspect all wiring for rodent damage
Protect exposed connections with dielectric grease
6. Periodic Inspection Schedule for Huaquan Generator Set
Monthly visual checks for corrosion
Quarterly functional tests of safety systems
Semi-annual load bank testing recommendation
7. Recommissioning Preparation
Complete full system inspection before restart
Verify all fluid levels meet specifications
Test emergency shutdown systems
Following these post-shutdown maintenance procedures helps ensure your Huaquan generator set remains in optimal condition during inactive periods and is ready for reliable operation when needed.